Jiangsu Zhongkang Environmental Protection Equipment Co., Ltd Since 2011
Home
Case studies
Petrochemical Complex VOCs Treatment
Shanghai, China
2024
Chemical & Petrochemical gas treatment
Challenge

Treatment of 50,000 m³/h of VOCs-laden exhaust gas from multiple production units with varying concentrations and compositions.

Solution

Custom-designed Regenerative Thermal Oxidizer (RTO) system with advanced heat recovery and automated control systems.

99.8%
Efficiency
40%
Energy Savings
100%
Compliance
2.5 years
Payback
Key Benefits
  • Exceeded regulatory requirements
  • Significant energy cost reduction
  • Improved operational reliability
★★★★★
"The RTO system exceeded our expectations. Not only did we achieve 99.8% destruction efficiency, but the energy recovery system reduced our operating costs by 40%."
Environmental Manager
Petrochemical Corporation
Automotive Paint Shop Air Treatment
Guangzhou, China
2023
Automotive gas treatment
Challenge

Control of paint booth emissions and welding fumes across multiple production lines while maintaining energy efficiency.

Solution

Integrated air treatment system combining thermal oxidation for paint booth emissions and fume extraction for welding areas.

98.5%
Efficiency
35%
Energy Savings
100%
Compliance
3 years
Payback
Key Benefits
  • Improved worker safety
  • Reduced emission levels
  • Energy cost savings
★★★★★
"The integrated system solved our air quality challenges while reducing energy costs. Worker safety has improved significantly."
Plant Manager
Automotive Manufacturer
Semiconductor Silane Gas Treatment
Suzhou, China
2025
Electronics gas treatment
Challenge

Safe disposal of pyrophoric silane gas and other hazardous gases from semiconductor manufacturing processes.

Solution

Automated silane combustion system with emergency shutdown capabilities and continuous monitoring.

99.99%
Efficiency
25%
Energy Savings
100%
Compliance
2 years
Payback
Key Benefits
  • Zero safety incidents
  • Complete gas destruction
  • Automated operation
★★★★★
"The silane combustion system provides peace of mind with its safety features and reliable operation. Zero incidents since installation."
Safety Director
Semiconductor Facility
Power Plant Flue Gas Treatment
Hebei, China
2023
Power Generation gas treatment
Challenge

Flue gas desulfurization and particulate control to meet stringent emission standards.

Solution

Integrated FGD system with electrostatic precipitator for comprehensive emission control.

95%
Efficiency
20%
Energy Savings
100%
Compliance
4 years
Payback
Key Benefits
  • SO2 reduction achieved
  • Particulate control
  • Regulatory compliance
★★★★★
"The FGD system helped us meet all emission standards while maintaining operational efficiency."
Operations Manager
Power Plant
Textile Dye House Emission Control
Jiangsu, China
2023
Textile gas treatment
Challenge

Control of dye house emissions and odors while recovering valuable solvents.

Solution

Thermal oxidizer with solvent recovery system for emission control and cost savings.

97%
Efficiency
45%
Energy Savings
100%
Compliance
2.8 years
Payback
Key Benefits
  • Odor elimination
  • Solvent recovery
  • Energy savings
★★★★★
"The system not only controlled emissions but also recovered valuable solvents, providing significant cost savings."
Production Director
Textile Complex
Electronics Cleanroom Air System
Shenzhen, China
2024
Electronics air purification
Challenge

Maintaining ultra-clean air quality in semiconductor cleanroom environments.

Solution

Advanced HEPA filtration system with precise environmental control.

99.97%
Efficiency
20%
Energy Savings
100%
Compliance
2.5 years
Payback
Key Benefits
  • Ultra-clean environment
  • Product quality improvement
  • Contamination prevention
★★★★★
"The cleanroom air system maintains perfect environmental conditions, ensuring our product quality standards."
Production Manager
Electronics Facility
Pharmaceutical Clean Air System
Tianjin, China
2023
Pharmaceutical air purification
Challenge

Maintaining sterile air conditions for pharmaceutical manufacturing.

Solution

Multi-stage air purification system with HEPA and ULPA filtration.

99.99%
Efficiency
15%
Energy Savings
100%
Compliance
3 years
Payback
Key Benefits
  • Sterile environment
  • Product safety
  • Regulatory compliance
★★★★★
"The clean air system ensures our pharmaceutical products meet the highest safety and quality standards."
Quality Director
Pharmaceutical Facility
Metal Processing Fume Control
Liaoning, China
2023
Metal Processing air purification
Challenge

Control of metal fumes and dust from welding and cutting operations.

Solution

Comprehensive fume extraction and filtration system.

98%
Efficiency
25%
Energy Savings
100%
Compliance
3.5 years
Payback
Key Benefits
  • Worker safety improvement
  • Emission control
  • Equipment protection
★★★★★
"The fume control system dramatically improved our workplace air quality and worker safety."
Safety Manager
Steel Processing Facility
Laboratory Air Purification
Shanghai, China
2024
Research air purification
Challenge

Maintaining clean air in multiple laboratory environments with varying requirements.

Solution

Modular air purification system with customizable filtration stages.

99.5%
Efficiency
30%
Energy Savings
100%
Compliance
2.8 years
Payback
Key Benefits
  • Research environment protection
  • Personnel safety
  • Equipment protection
★★★★★
"The air purification system provides the perfect environment for our sensitive research work."
Laboratory Director
Research Complex

Our Track Record

Proven results across industries and applications

1,100+
Successful Projects
99%+
Average Efficiency
50+
Countries Served
100%
Compliance Rate

Ready to Create Your Success Story?

Join thousands of satisfied customers who have achieved their environmental goals with our solutions.

4.9/5
Customer Rating
ISO
Certified
1100+
Projects